Tri-K Gold Mine – Guinea

The Tri-K Gold Mine, located in Guinea, is a high grade open pit mining operation. Enviroblue secured the contract in 2019 to design, develop, implement and commission the main control system using Siemens TIA Portal V16. & WinCC v7.5 solution. Our solution was customized as per the specifications provided. The system comprised of the various stations as per the system architecture below and consisted of 906 remote I/Os, 202 devices (VSDs and simocodes) and various vendor system interfaces on profibus. Completion of project expected in 2021.

System Architecture:

Scope of Engineering Services:

  • Installation and configuration of all AS and OS stations.
  • Build of granular type multi-project environment.
  • PLC and Scada software as defined by the Process functional specifications.
  • Assisted with profibus network faults/failures.
  • Assisted with Siemens G120/G130 VSD parameterization.
  • Assisted with Simocode Pro v setup and configurations.
  • Commissioning assistance and fault analysis of main plant software and hardware.
  • Assisted the various vendors’ with commissioning and software changes.
  • Assisted with MCC testing.
  • Provide remote system support services.
  • Fiber Optic Cabling, Fusion Splicing, and OTDR Testing

More To Explore

Tri-K Gold Mine – Guinea

The Tri-K Gold Mine, located in Guinea, is a high grade open pit mining operation. Enviroblue secured the contract in 2019 to design, develop, implement

Copper Mine – Spain

Is a Copper mine based in the south Spain that was re-furbished and installed with a new control system and new Motor control centres’. Our