Tri-K Gold Mine – Guinea

The Tri-K Gold Mine, located in Guinea, is a high grade open pit mining operation. Enviroblue secured the contract in 2019 to design, develop, implement and commission the main control system using Siemens TIA Portal V16. & WinCC v7.5 solution. Our solution was customized as per the specifications provided. The system comprised of the various stations as per the system architecture below and consisted of 906 remote I/Os, 202 devices (VSDs and simocodes) and various vendor system interfaces on profibus. Completion of project expected in 2021.

System Architecture:

Scope of Engineering Services:

  • Installation and configuration of all AS and OS stations.
  • Build of granular type multi-project environment.
  • PLC and Scada software as defined by the Process functional specifications.
  • Assisted with profibus network faults/failures.
  • Assisted with Siemens G120/G130 VSD parameterization.
  • Assisted with Simocode Pro v setup and configurations.
  • Commissioning assistance and fault analysis of main plant software and hardware.
  • Assisted the various vendors’ with commissioning and software changes.
  • Assisted with MCC testing.
  • Provide remote system support services.
  • Fiber Optic Cabling, Fusion Splicing, and OTDR Testing

More To Explore

Tri-K Gold Mine – Guinea

The Tri-K Gold Mine, located in Guinea, is a high grade open pit mining operation. Enviroblue secured the contract in 2019 to design, develop, implement

Copper Mine – Spain

Is a Copper mine based in the south Spain that was re-furbished and installed with a new control system and new Motor control centres’. Our

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.